On July 4, 2010, the 3-person team led by SCG project operation director, Mr. Surapon visited Sinoma EC. Sinoma EC’s Chairman of Board of Directors, Mr. Zhang Qi, General Manager, Mr. He Xinping, Vice President, Mr. Ge Liwu, Chief Engineer, Mr. Dong Lanqi respectively met with them.

 

">

成人高潮片免费网站-毛片久久精品-国产激情精品-2021久久-www..com黄色-午夜免费啪在线观看视频-99热网站-久久视频精品在线-人与禽交av在线播放-国产白嫩护士在线播放-男女爽爽爽-特级一级片-亚洲国产成人影院在线播放-一路向西在线看-激情五月少妇a

Position: 首頁 < Home < News < Company News

Technical Communications between Sinoma EC and SCG

PublishDate:2010-07-13 Source:

On July 4, 2010, the 3-person team led by SCG project operation director, Mr. Surapon visited Sinoma EC. Sinoma EC’s Chairman of Board of Directors, Mr. Zhang Qi, General Manager, Mr. He Xinping, Vice President, Mr. Ge Liwu, Chief Engineer, Mr. Dong Lanqi respectively met with them.

In the two-day meeting, technical details were talked, including WHR power plant operation, maintenance, spare parts supply and plant overhauling. Leaders and employees from marketing, project execution, technical and R&D, procurement, after sale divisions attended these discussions.

Sinoma EC built 6 WHR power plant for 3 cement plants of SCG, with total installed capacity of 58MW. The WHR plants for SCG TS plant first phase (9MW), second phase WHR (22MW), TL plant (18MW), LP plant(9 MW) were built by Sinoma EC, and all of them are now in good operation.

?